FLL Challenge Update 03
UPDATE 03 – MISSION 02: TOPSOIL CLEARING CRITERIA – Mission 02 includes three topsoil sections, each requiring a unique action to be considered cleared: • One section (identified by its loop) must be completely removed, so it is no longer touching the model. • The second section must be slid until the latch drops fully. • The third section must be rotated until it is completely past the designated line marked on the mat. The mission video demonstrates each clearing method and can be used as a reference for intended functionality.